The extension of the runway, coupled with the installation of precision approach, has significantly reduced flight cancellations at Gaspé Airport, increasing the landing rate from 85% to 98%. This improvement ensures the continuity of air services, even in adverse weather conditions.
Preserving a wetland area on the construction site and recovering onsite fill material to minimize external sourcing significantly contributed to reducing the environmental impact of the project.
The work was carried out with minimal runway closure, which helped maintain the continuity of airport operations.